A change in plans as we move the entrance from the southwest side to the east side. We decided it was too busy between the buildings to provide access to all four units on three level with only 18 feet of space between the buildings to work with. The result would detract from a peaceful, full view approach and entrance to each unit. By moving the top floor unit entrance to the northeast side it will have a private entry and entrance deck just off the road so it will be the most accessible of the units in this section. Jason and Alfredo are cutting the entry door out of the Eco-Panel. We'll frame in the original door panel opening on the other side.